Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | Yes |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Developed in 1981 by French Sogreah, Accropode is a concrete material cast in one-time by fixed formwork. The precast of Accropode typically utilizes shaped composite steel formwork, assembled by 2 symmetrical units. Concrete is layered into the mold, vibrated, and compacted. After pouring, the plaster is compacted, and the mold is dismantled and maintained after 20 hours at normal temperature (25ºC).
The Accropode structure comes in two types: A-type and B-type. A-type is shorter and fatter with chamfered ribs, making it firmer and easier to demould. B-type is thinner and taller, suitable for small tonnage blocks with longer legs.
Prefabrication process: formwork inspection and cleaning, brushing release oil, formwork installation, concrete placement, demoulding, repair and maintenance, component stacking.
Company: Zhuozhou Tianpeng Imp. & Exp. Trade Co., Ltd.
ZhuozhouTianpeng imp. and exp. Trade co., ltd is founded in 2006, and specialize in the design, manufacture and supply of high quality construction materials testing equipment for concrete test, soil test, cement test, asphalt test and etc. Our main products include compression test machine, wheel tracking machine, roller compactor, test mould and etc. There are about hundred products of seven series.
|