Customization: | Available |
---|---|
After-sales Service: | All Life |
Delivery: | 2-3weeks |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High Quality Steel Tetrapod Mould for concrete Precast
Application Design
Accropode is developed in 1981 by French Sogreah. The material is concrete, which is cast in one-time by the fixed formwork.
The precast of accropode usually adopts the shaped composite steel formwork, and each set of formwork is assembled by 2 mutually symmetrical units. The concrete is stratified into the mold in layers and vibrated by interted vibrator. After pouring, the plaster is compacted. Under the normal temperature (25ºC), the mold is dismantled and maintained after 20h. Prefabrication process: formwork inspection and cleaning → brushing release oil → formwork installation → concrete placement → demoulding → repair and maintenance → component stacking.
The accropode structure is divided into two types: A-type and B-type accropode. Compared with B-type, A-type accropode is shorter and fatter with chamfered ribs, and A-type is firmer and easier to demould. B-type block is thinner and taller. It has longer legs and is difficult to demould, which is only for small tonnage block.
ZhuozhouTianpeng imp. and exp. Trade co., ltd is founded in 2006, and specialize in the design, manufacture and supply of high quality construction materials testing equipment for concrete test, soil test, cement test, asphalt test and etc. Our main products include compression test machine, wheel tracking machine, roller compactor, test mould and etc. There are about hundred products of seven series.
|
Tianpeng logo is branded and internationally qualified and the company image is well known worldwide. We believe that we can supply more top quality product and service for more customer's trough our further effort in near future.
1.What's the detailed purchase process?
E-mail order process: Please E-mail or call us. We will reply you during the working time with invoice and payment info to you, then you make payment. We arrange the delivery of the goods when we receive your payment.
2.What information shall be provided for the mail order?
Company Name
Billing and shipping addresses
Payment Information,Or other payment methods
Telephone number
Catalog number, product description, size, and quantity
3.May we make payment after you diliver the order?
We can't accept the delivery before payment. We make delivery after receiving the payment. If you want to make delivery earlier, please make order via shop online.
4.How to make payment?
Pease make payment via shop online of our official website
Please make payment via Paypal
Please make payment via Western Union (Account No.)
Please make payment via bank transfer
5.What's the delivery time? When can we receive the product?
We will make delivery within three working days after receiving the payment if we have the stock, and will note you the express tracking number the same time. But if we don't have the stock, we will let you know the detailed delivery time, and normally delivery time of international courier express is 3 to 5days.
6.How to calculate the freight?
Freight costs are different as per delivery destinations.
7.Can we have the discount if we often order your products?
We usually don't make discounts for the first purchase. But for long term cooperation, we will make some discounts accordingly.
8.Will the product quality be affected during the transportation?
Our product quality is very stable, and it won't be affected within 2 to 3 weeks' transportation at room temperature.
9.Can we get the quality document the same time when we receive the products?
We will offer product COA with the products.
10.Shall I run any risks if order the products online?
Our shop online is very safe and stable, so you won't run any risks for the deal or information leakage, and can use it safely.
- See more at: http://cheerjazz.en.made-in-china.com